Concrete Calculator
Work out how much concrete you need in cubic yards and bags for a slab, footing or round column, with a waste allowance and a ready-mix cost estimate.
How to Use the Concrete Calculator
- Choose your shape: pick "Slab / Square" for patios, driveways, sidewalks and footings, or "Column / Cylinder" for round piers, tube forms and post holes.
- Enter the dimensions: for a slab, enter the length and width in feet and the thickness in inches. For columns, enter the diameter in inches, the height in feet and how many columns you are pouring.
- Add a waste allowance (optional): type a percentage, such as 10, to cover spillage, an uneven subgrade or forms that bow slightly. Leave it blank to see the exact calculated volume.
- Set the price per cubic yard: the default of $150 is only a placeholder. Replace it with your supplier's quote, including delivery.
- Read the results: they update as you type, with no Calculate button.
What You'll Discover
- Concrete needed in cubic yards, which is the unit ready-mix suppliers use when you order a truck. If you entered a waste percentage, it is already included.
- Cubic feet and cubic meters of the same volume, handy for bag math and for metric suppliers.
- 80lb and 60lb bag counts, rounded up to whole bags. The calculator assumes about 0.6 cubic feet per 80lb bag and 0.45 cubic feet per 60lb bag. Yields differ by product, so check the label on the mix you buy.
- Ready-mix cost estimate: cubic yards multiplied by your price per yard. It does not include delivery or short-load fees unless your quoted price already does, and it does not price the bags.
These are estimates only, not professional advice. Soil, forms, reinforcement, local building code and your supplier's mix all affect the real quantity. For structural work such as foundations, retaining walls or load-bearing slabs, confirm the plan with your building department or an engineer before you order.
How to Calculate Cubic Yards of Concrete
Concrete volume is length × width × thickness, converted to cubic yards. Because slab thickness is usually measured in inches, the quickest hand formula is:
Cubic yards = Length (ft) × Width (ft) × Thickness (in) ÷ 324
The 324 comes from 12 inches per foot times 27 cubic feet per cubic yard. A 12 ft × 16 ft slab that is 4 inches thick is 12 × 16 × 4 ÷ 324 = 2.37 cubic yards, or 64 cubic feet.
Round columns, piers and post holes
For a cylinder, use π × (diameter ÷ 2)² × height. Convert the diameter from inches to feet by dividing by 12 before you square it, or let the calculator do it. A 12-inch tube form that is 4 feet deep holds π × 0.5² × 4 = 3.14 cubic feet, which is 0.12 cubic yards.
Footings and trenches
A footing is a long, narrow slab. Use the slab mode and enter its length, its width in feet (16 inches is 1.33 ft) and its depth in inches. The length converter helps if your plan is in centimeters or meters, and the square footage calculator helps you measure the area of each part of an irregular pour.
The 81 rule and coverage per cubic yard
One cubic yard is 27 cubic feet, so it covers 27 ÷ (thickness in feet) square feet. At 4 inches that is 81 square feet, which is why "square feet ÷ 81" is a popular shortcut for 4-inch slabs.
| Slab thickness | Area covered by 1 cubic yard | Cubic yards per 100 sq ft |
|---|---|---|
| 3 in | 108 sq ft | 0.93 |
| 4 in | 81 sq ft | 1.23 |
| 5 in | 64.8 sq ft | 1.54 |
| 6 in | 54 sq ft | 1.85 |
| 8 in | 40.5 sq ft | 2.47 |
Slab Thickness, Waste and Common Sizes
Thickness drives the order size more than anything else: going from 4 to 6 inches adds 50% to the volume. The figures below are general rules of thumb, not code requirements. Residential codes, soil conditions and the load on the slab decide the real thickness, so confirm it with your local building department. Footing width and depth in particular are set by code, soil and frost depth, not by a general rule.
| Project | Common thickness | Note |
|---|---|---|
| Patio, walkway, shed pad | 4 in | Light foot traffic and static loads. |
| Driveway | 4–6 in | Heavier vehicles point to the thicker end. |
| Garage floor | 4–6 in | Check local code and the vehicles you will park. |
| Footing | Set by code | Depends on soil, frost depth and the structure above. |
How much extra to order
Subgrades are rarely perfectly flat and forms bow outward under the weight of wet concrete, so the real volume is almost always a little higher than length × width × thickness. Many people add 5–10%, and more for a rough or excavated base. Use the waste box above instead of doing the math twice: a 12 ft × 16 ft, 4-inch slab with 10% extra comes to 2.61 cubic yards instead of 2.37. It is much cheaper to have a little left over than to run short in the middle of a pour.
Volumes for common slab sizes
These values are exact volumes with no waste added, and bag counts are rounded up to whole 80lb bags at 0.6 cubic feet each.
| Slab size | Area | 4 in thick | 5 in thick | 6 in thick | 80lb bags at 4 in |
|---|---|---|---|---|---|
| 10 × 10 ft | 100 sq ft | 1.23 yd³ | 1.54 yd³ | 1.85 yd³ | 56 |
| 12 × 12 ft | 144 sq ft | 1.78 yd³ | 2.22 yd³ | 2.67 yd³ | 80 |
| 12 × 16 ft | 192 sq ft | 2.37 yd³ | 2.96 yd³ | 3.56 yd³ | 107 |
| 16 × 16 ft | 256 sq ft | 3.16 yd³ | 3.95 yd³ | 4.74 yd³ | 143 |
| 20 × 20 ft | 400 sq ft | 4.94 yd³ | 6.17 yd³ | 7.41 yd³ | 223 |
| 24 × 24 ft | 576 sq ft | 7.11 yd³ | 8.89 yd³ | 10.67 yd³ | 320 |
Bagged Concrete vs Ready-Mix
Pre-mixed bags are convenient for small jobs because there is no delivery window and no minimum order. Ready-mix wins as the volume grows because the whole pour is mixed consistently, arrives at once and needs no hand mixing.
Using this calculator's yields, one cubic yard (27 cubic feet) is 45 bags of 80lb mix (27 ÷ 0.6) or 60 bags of 60lb mix (27 ÷ 0.45). A 4-inch, 10 × 10 ft slab needs 56 of the 80lb bags. That is a lot of lifting, mixing and a tight working time, so most people choose delivery for any pour beyond a small pad.
| Factor | Bagged mix | Ready-mix delivery |
|---|---|---|
| Best for | Post holes, small pads and repairs, up to about 1 cubic yard | Slabs, driveways and footings of 1 cubic yard or more |
| Consistency | Depends on how carefully each batch is mixed | Mixed to a specified strength at the plant |
| Labor | You lift and mix every bag | Chute and wheelbarrow, or pump, with a crew |
| Cost comparison | Bag price × 45 gives the cost per cubic yard (80lb bags) | Quoted per cubic yard, plus any delivery or short-load fees |
To compare prices, multiply the price of one 80lb bag by 45. A bag priced at $6 works out to $270 per cubic yard, before your own time and equipment. Ask suppliers about minimum order sizes, short-load fees and how long they allow to unload, because those extras can change the answer for small deliveries. For a rough area check before you order, try the square footage calculator.
How Much Concrete Do I Need If...
How much concrete do I need if my slab is 10 x 10 feet and 4 inches thick?
A 10 × 10 ft slab at 4 inches thick needs about 1.23 cubic yards, or roughly 56 bags of 80lb mix. That is 33.3 cubic feet. At 6 inches thick it rises to 1.85 cubic yards and 84 bags.
How much concrete do I need if my patio is 12 x 12 feet?
A 12 × 12 ft patio at 4 inches needs 1.78 cubic yards, or 80 bags of 80lb mix. That is exactly 48 cubic feet. At 5 inches it is 2.22 cubic yards.
How much concrete do I need if I add 10% for waste on a 12 x 16 foot slab?
A 12 × 16 ft slab at 4 inches with 10% waste needs about 2.61 cubic yards. Without waste it is 2.37 cubic yards. The extra 0.24 cubic yards is a cushion against an uneven base and spillage. Enter 10 in the waste box to see it.
How much concrete do I need if my driveway is 20 x 20 feet and 5 inches thick?
A 20 × 20 ft driveway at 5 inches thick needs about 6.17 cubic yards. With 10% extra, order about 6.79 cubic yards. At 6 inches the exact volume is 7.41 cubic yards.
How much concrete do I need if my garage slab is 24 x 24 feet and 6 inches thick?
A 24 × 24 ft slab at 6 inches thick needs 10.67 cubic yards. That is 288 cubic feet. With 5% extra it is 11.20 cubic yards. A pour this size is a ready-mix job, since it would take about 480 bags of 80lb mix.
How much concrete do I need if my shed base is 8 x 10 feet?
An 8 × 10 ft base at 4 inches thick needs about 0.99 cubic yards, or 45 bags of 80lb mix. With 10% extra it is 1.09 cubic yards and 49 bags. This is close to the point where a delivery starts to make sense.
How much concrete do I need if my sidewalk is 3 feet wide and 30 feet long?
A 3 ft × 30 ft sidewalk at 4 inches thick needs about 1.11 cubic yards, or 50 bags of 80lb mix. That is 30 cubic feet. Enter 30 as the length, 3 as the width and 4 as the thickness.
How much concrete do I need if my footing is 40 feet long, 2 feet wide and 12 inches deep?
That footing needs about 2.96 cubic yards, or 80 cubic feet. With 10% extra it is 3.26 cubic yards. Footing size is set by local code, soil and frost depth, so treat this as the math only and confirm the dimensions with your building department.
How much concrete do I need if I am filling a 12-inch round pier, 4 feet deep?
A 12-inch diameter column that is 4 feet deep holds about 3.14 cubic feet, or 0.12 cubic yards, which is 6 bags of 80lb mix. Choose "Column / Cylinder", enter 12 for the diameter and 4 for the height. Three of these piers with 10% waste come to 0.38 cubic yards.
How much concrete do I need if I am setting six fence posts in 10-inch holes, 3 feet deep?
Six holes that are 10 inches wide and 3 feet deep need about 9.8 cubic feet, or 0.36 cubic yards, which is 17 bags of 80lb mix. Each hole takes about 1.64 cubic feet. Note that a post sits inside the hole and displaces some of the concrete, so this is a slightly high estimate.
People Also Search For
How to calculate cubic yards of concrete
Multiply length, width and thickness in feet, then divide by 27. If thickness is in inches, use length (ft) × width (ft) × thickness (in) ÷ 324. For 12 × 16 ft at 4 inches: 12 × 16 × 4 = 768, and 768 ÷ 324 = 2.37 cubic yards.
How many 80 lb bags of concrete make a cubic yard
About 45 bags of 80lb mix make a cubic yard, based on a yield of 0.6 cubic feet per bag. The same math gives 60 bags of 60lb mix at 0.45 cubic feet each. Real yields vary by product, so check the bag label before you buy.
How many square feet does a yard of concrete cover
One cubic yard covers about 81 square feet at 4 inches thick. It covers 108 square feet at 3 inches, 64.8 at 5 inches and 54 at 6 inches. Divide your area by the coverage figure to estimate yards.
How much does a cubic yard of concrete weigh
A common planning figure is about 150 lb per cubic foot, which is roughly 4,050 lb (about 2 tons) per cubic yard. Weight varies with the mix and aggregate. Use it for a rough sense of load, such as a wheelbarrow route or a trailer, not for engineering.
How to calculate concrete for a round column or tube form
Use π × radius² × height, with the radius in feet. A 16-inch diameter has a radius of 8 inches, or 0.667 ft, so a 3-ft column holds π × 0.667² × 3 = 4.19 cubic feet. The calculator's column mode does this and multiplies by the number of columns.
How to convert cubic feet to cubic yards or cubic meters
Divide cubic feet by 27 to get cubic yards. 80 cubic feet is 80 ÷ 27 = 2.96 cubic yards. Multiply cubic yards by 0.7646 to get cubic meters, so 2.96 cubic yards is about 2.27 cubic meters.
Frequently Asked Questions
How many bags of concrete do I need for a 10x10 slab?
A 10 × 10 ft slab at 4 inches thick needs about 1.23 cubic yards, or 56 bags of 80lb mix. At 6 inches thick you need about 1.85 cubic yards, or 84 bags. For this volume, ready-mix delivery is often more practical than mixing bags by hand.
How thick should a concrete slab be?
Many patios, walkways and shed pads are poured 4 inches thick, and driveways and garage floors commonly 4 to 6 inches, with the thicker end for heavier vehicles. These are rules of thumb. Residential codes, soil conditions and the loads on the slab set the real requirement, so check with your local building department before you pour.
How much extra concrete should I order?
Many people add about 5 to 10% to the calculated volume to cover spillage, an uneven subgrade and forms that bow outward, and more for a rough base. Type the percentage into the waste box. For a 12 × 16 ft, 4-inch slab, 10% extra raises 2.37 cubic yards to about 2.61. Having a little left over is cheaper than running short mid-pour.
What is the difference between 80lb and 60lb bags?
They hold the same kind of mix in different quantities. This calculator assumes about 0.6 cubic feet for an 80lb bag and 0.45 cubic feet for a 60lb bag, so a cubic yard is about 45 and 60 bags. Yields vary by product, so check the label. A 60lb bag is easier to lift, but you need more of them.
How much does a cubic yard of concrete cost?
It varies widely by region, mix strength, delivery distance and fees, so get a quote from local suppliers. The $150 default in the calculator is a placeholder only. Ask about minimum order sizes, short-load fees and waiting-time charges, and enter the price that includes them for a realistic estimate.
Can I pour concrete in cold weather?
Yes, with precautions. The National Ready Mixed Concrete Association defines cold weather as an average daily temperature below 40°F for more than three successive days. It says fresh concrete freezes at about 25°F, can lose more than 50% of its potential strength if it freezes, and should be protected until it reaches 500 psi, about two days at 50°F. Source: NRMCA CIP 27. Ask your supplier about cold-weather mixes and protection.
How long does concrete take to cure?
Concrete keeps gaining strength for weeks, and strength requirements are usually specified at 28 days, according to NRMCA CIP 35. Time before foot or vehicle traffic depends on the mix, temperature and any admixtures, so follow your supplier's or product's instructions. Keeping the surface from drying out in the first days after the pour helps it cure properly.
Do I need rebar or wire mesh in my concrete?
It depends on the use, the soil and local code. Reinforcement is common in slabs that carry vehicles and is required in many structural elements such as foundations and retaining walls. Ask your building department, and consult an engineer for anything load-bearing. The calculator does not subtract the small volume taken up by rebar or mesh.
Can I use this calculator for footings, steps or L-shaped slabs?
Yes, by breaking the job into rectangles. A footing is a long, narrow slab, so enter its length, width in feet and depth in inches. For an L-shape or a stepped pour, calculate each rectangle separately and add the cubic yards together. Round pours such as piers and post holes use the column mode.
Why does my bag count differ from other calculators?
Bag counts depend on the yield assumed per bag, and on whether waste is included. This calculator uses 0.6 cubic feet for an 80lb bag and 0.45 cubic feet for a 60lb bag, and rounds up to whole bags. If your product's label states a different yield, divide your cubic feet by that number instead.
Can I enter metric measurements?
The inputs use feet and inches, but the results include cubic meters. To use metric dimensions, convert them first with the length converter (1 meter is about 3.281 feet and 1 centimeter is about 0.394 inches), then enter the converted values.
Is my data stored or sent anywhere?
No. All calculations run in your browser. Nothing you type is sent to a server or saved, and no account is needed.
Last reviewed: November 2026 — formulas and worked examples verified.